NEW QUESTION # 33
______________ provides a consistent methodology for assessing the optimum combination of methods and frequencies.

  • A. PHA
  • B. REM
  • C. HAZOP
  • D. RBI

Answer: D


NEW QUESTION # 34
Failure mode can primarily affects the

  • A. A&B
  • B. Magnitude
  • C. Consequences

Answer: B


NEW QUESTION # 35
Potential source of errors in RBI analysis regarding data quality are the following except

  • A. Inspector error
  • B. Advanced inspection methods
  • C. Assumptions in equipment history
  • D. Outdated drawings and documentation

Answer: B


NEW QUESTION # 36
Consequence is always.............For safety aspects

  • A. Neutral
  • B. Negative
  • C. Positive

Answer: B


NEW QUESTION # 37
Damage mechanisms where deterioration rates are immeasurable or unknown are

  • A. Stress corrosion cracking
  • B. All of the above
  • C. Both a and b
  • D. Hydrogen inducen cracking
  • E. Thinning

Answer: C


NEW QUESTION # 38
Deterioration susceptibility and rate can be done

  • A. By groupingthe same material of construction/similar process/environment
  • B. By random inspection method
  • C. Not possible to group under any circumstances

Answer: A


NEW QUESTION # 39
CORRECT TEXT
Rp 580 significantly targeted at the application of rbi in the.................and
.............industry

Answer:

Explanation:
Hydrocarbon
and chemical process


NEW QUESTION # 40
_____________Depict ways in which the system failures rep- resentedin the event trees can occur.

  • A. Event trees
  • B. Fault trees
  • C. Logic trees

Answer: A


NEW QUESTION # 41
Following are not the residual risk factors for loss of containment.

  • A. Human error
  • B. Fundamental limitations of inspection method
  • C. Toxic fluid containment
  • D. Natural disasters

Answer: C


NEW QUESTION # 42
The suitability and current condition of the equipment within the current operating envelope will determine the ______________ of the equipment from one or more deterioration mechanisms.

  • A. Relative risk
  • B. Total risk
  • C. Consequence of failure
  • D. Probability of failure (pot)

Answer: D

Explanation:
Explanation/Reference:


NEW QUESTION # 43
Some failures have potentially serious consequences, but if the probabilityof the incident is low, then

  • A. The risk may warrant appropriate mitigation action
  • B. The risk may not warrant immediate action
  • C. The risk may warrant immediate action

Answer: B


NEW QUESTION # 44
Reliability efforts, such as reliability centered maintenance (REM), can be linked with RBI, resulting in an
integrated program to

  • A. To reduce risk by mitigation activities
  • B. Reduce downtime in an operating unit
  • C. Reduce operating time of a unit

Answer: B


NEW QUESTION # 45
Generally, a qualitative analysis using broad ranges requires a __________________ from the user than a
quantitative approach.

  • A. Lower level of judgment, skill and understanding
  • B. Higher level of judgment, skill and understanding

Answer: B


NEW QUESTION # 46
Fora typical inspection program, if excessive inspectionis applied then,

  • A. Level of risk may go down
  • B. Level of risk remain the same
  • C. Level of risk may go up

Answer: C


NEW QUESTION # 47
Quantitative risk analysis logic models generally consist of___________and______

  • A. Product trees and loss trees
  • B. Event tees and fault trees
  • C. Likelihood trees and consequence trees

Answer: B


NEW QUESTION # 48
The RBI program for environmental consequences, typically focuses

  • A. On acute and immediate chronic risks than immediate environmental risks
  • B. On acute and immediate environmental risks, rather than chronic risks from low-level emissions
  • C. Non threat environmental risks

Answer: B


NEW QUESTION # 49
If the probability and consequence combination (risk) is high enough to be unacceptable,
then

  • A. A mitigation action to predict or prevent the eventis recommended.
  • B. Warrant to analyze risks involved
  • C. Amitigation action to predict or prevent the event isnot recommended

Answer: A


NEW QUESTION # 50
Hazard identification in a RBI analysis generally focuses on identifiable failure mechanisms in the equipment (inspectable causes) but does not explicitly deal with

  • A. Other potential failure scenarios resulting from events such as power S failures or human errors
  • B. Other potential failure resulting from events such as flammable fire due to leak from equipment
  • C. Environmental impact caused due to toxic release

Answer: A


NEW QUESTION # 51
Termination of the ability of a system, structure, or component to perform its required function of containment
of fluid (le loss of containment)

  • A. Outcome
  • B. Failure
  • C. Risk

Answer: B


NEW QUESTION # 52
........Is not a substitute for a process hazards analysis (pha) or hazop

  • A. Hazop
  • B. Rbi
  • C. Pha
  • D. Rem

Answer: C


NEW QUESTION # 53
Is a risk management activity that may lead to risk reduction?

  • A. Evaluation
  • B. Analysis
  • C. Inspection

Answer: C


NEW QUESTION # 54
The type of failure mode that likely to occur due to pitting

  • A. Small holes to ruptures
  • B. Small hole sized leaks
  • C. Cracks
  • D. Catastrophic rupture

Answer: B


NEW QUESTION # 55
Toxic releases in RBI are only addressed when they affect

  • A. Personnel
  • B. Equipment
  • C. Process

Answer: A


NEW QUESTION # 56
......


What is the duration of the API-580 Exam

  • Number of Questions: 70
  • Length of Examination: 3.25 hours
  • Format: Multiple choices, multiple answers

For more info visit:

API-580 Exam Reference

 

Pass Your API Exam with API-580 Exam Dumps: https://braindumpsschool.vce4plus.com/API/API-580-valid-vce-dumps.html