[Jan 12, 2024] Reliable C1000-132 Exam Tips Test Pdf Exam Material [Q31-Q56]

Share

[Jan 12, 2024] Reliable C1000-132 Exam Tips Test Pdf Exam Material

New 2024 C1000-132 Test Tutorial (Updated 66 Questions)


IBM C1000-132 exam consists of 63 multiple-choice questions that need to be answered within 90 minutes. A candidate needs to score at least 68% to pass the exam. C1000-132 exam can be taken online or at an authorized testing center. Before taking the exam, candidates should have a strong understanding of Maximo and should have experience implementing it in a business environment. They should also be familiar with the exam objectives and be prepared to answer questions related to Maximo architecture, installation, configuration, and maintenance. Passing the IBM C1000-132 exam can help professionals enhance their career prospects and showcase their expertise in Maximo.

 

NEW QUESTION # 31
When using flow control on a Work Order, how ca from the Parent to Child Work Orders?
user ensure that Work Order status changes are inherited

  • A. Check the Roll Down Status Changes flag on the Parent and Child Work Order.
  • B. In the Organization application, check the Intarit Status Changes flag in Work Order Options -> Flow Control Options.
  • C. Check the Inherit Status Changes flag on the Work Order and ensure the mxe.app.wo.flowControlStatuslnheritance System Properties is set to 1.
  • D. Ensure the Asset or Location
    on both the Parent and Child Work Order.

Answer: B

Explanation:
When using flow control on a Work Order in IBM Maximo Manage, to ensure that Work Order status changes are inherited from the Parent to Child Work Orders, you should go to the Organization application and check the Inherit Status Changes flag in Work Order Options -> Flow Control Options.


NEW QUESTION # 32
In which application can a Contract property default be set for a specific contract type, for example Is early termination allowed by the Customer?

  • A. Organizations
  • B. Contract Administration
  • C. Database Configuration
  • D. System Properties

Answer: B

Explanation:
The Contract Administration application is used to set contract property defaults for specific contract types. For example, you can set whether early termination is allowed by the customer for a specific contract type.


NEW QUESTION # 33
Which statement is true regarding Master Preventative Maintenance (PM) records?

  • A. Associated PM records can only be created for a rotating item's location.
  • B. Associated PM records are temporary and expire after 90 days.
  • C. Associated PM records can be created for a Master PM which does not have an item
  • D. Associated PM records can only be created for a rotating item's asset.

Answer: C

Explanation:
Regarding Master Preventative Maintenance (PM) records in IBM Maximo Manage, associated PM records can be created for a Master PM which does not have an item.


NEW QUESTION # 34
When viewing a Storeroom in the Manage Inventory Work Center, what are three record sets (tabs) that can be viewed?

  • A. Counts
  • B. Reconcile
  • C. Year to Date Figures
  • D. Child Storerooms
  • E. Balances
  • F. Vendors

Answer: A,D,E

Explanation:
In IBM Maximo Manage v8.0 implementation, when viewing a Storeroom in the Manage Inventory Work Center, the three record sets (tabs) that can be viewed are Child Storerooms, Counts, and Balances. These record sets provide different views of the inventory and allow users to manage and track inventory levels and movements.


NEW QUESTION # 35
Apart from Standard and Average, what other three costing methods can be used in the Inventory application?

  • A. LIFO
  • B. Weighted Average
  • C. Asset
  • D. FILO
  • E. LILO
  • F. FIFO

Answer: A,B,F

Explanation:
Apart from Standard and Average costing methods in IBM Maximo Manage's Inventory application, three other costing methods that can be used are FIFO (First In First Out), LIFO (Last In First Out) and Weighted Average.


NEW QUESTION # 36
What is a licensing method used to obtain the Maximo Asset Suite?

  • A. User credits license
  • B. Cloud based license
  • C. Monthly license
  • D. Feature based license

Answer: B

Explanation:
One licensing method used to obtain the Maximo Asset Suite is a Cloud based license.


NEW QUESTION # 37
Which two domain types can have a specified error message?

  • A. CROSSOVER
  • B. SYNONYM
  • C. TABLE
  • D. NUMERIC
  • E. ALN

Answer: C,E

Explanation:
In IBM Maximo Manage, the two domain types that can have a specified error message are TABLE and ALN.


NEW QUESTION # 38
What is the result of selecting the Validate GL Component Combinations in the Chart of Accounts application on financial transactions?

  • A. Any GL component can be used.
  • B. Validates transactions occurred during an active financial period.
  • C. Any valid GL component can be used.
  • D. Only valid GL accounts can be used.

Answer: D

Explanation:
When selecting the Validate GL Component Combinations in the Chart of Accounts application on financial transactions in IBM Maximo Manage, only valid GL accounts can be used.


NEW QUESTION # 39
Which two records can be included as a contract line item on a Lease/Rental Contract?

  • A. Non-Rotating item
  • B. Tool
  • C. Asset
  • D. Rotating item
  • E. Non-Rotating Asset

Answer: C,D

Explanation:
In IBM Maximo Manage, two records that can be included as a contract line item on a Lease/Rental Contract are a Rotating item and an Asset.


NEW QUESTION # 40
How many failure reports can be created for the same Work Order?

  • A. just one failure report
  • B. unlimited failure reports for each work order, but none for a task
  • C. unlimited failure reports for either a work order or any of its tasks
  • D. one failure report for the work order and only one for each task of the work order

Answer: D

Explanation:
In IBM Maximo Manage, you can create one failure report for a Work Order and only one for each task of the Work Order.


NEW QUESTION # 41
What is the default status in the Quick Reporting Application?

  • A. INPRG
  • B. APPR
  • C. ENTERED
  • D. DRAFT

Answer: D

Explanation:
The default status in the Quick Reporting Application in IBM Maximo Manage is DRAFT.


NEW QUESTION # 42
In the Work Order Tracking application, a Work Order is generated from a Preventive Maintenance (PM) record. How is the target finish date calculated?

  • A. the Job Plan start date + the Job Plan duration
  • B. the PM target finish date
  • C. the Work Order target start date + the Job Plan duration
  • D. the Job Plan finish date

Answer: C

Explanation:
In the Work Order Tracking application, when a Work Order is generated from a Preventive Maintenance (PM) record, the target finish date is calculated as the Work Order target start date + the Job Plan duration.


NEW QUESTION # 43
Which Maximo application can be used to generate replacement plans for assets?

  • A. Maximo Health
  • B. Maximo Predict
  • C. Maximo Health, Safety and Environmental (HSE)
  • D. Maximo Manage

Answer: A

Explanation:
The Maximo Health application can be used to generate replacement plans for assets.


NEW QUESTION # 44
What happens if the Specification of a rotating item is updated in the Item Master application?

  • A. New locations and assets that reference the rotating item will inherit the changes, there are no changes to existing locations and assets.
  • B. Only locations inherit the specification from a rotating item and only when new locations are created. Assets only inherit the specification from an asset template.
  • C. By default, all locations and assets referencing the rotating item will be updated with the changes.
  • D. By default, existing assets referencing the rotating item will be updated with the changes, there are no changes to existing locations.

Answer: A

Explanation:
If the Specification of a rotating item is updated in the Item Master application, new locations and assets that reference the rotating item will inherit the changes. There are no changes to existing locations and assets.


NEW QUESTION # 45
What are three available associations in the Hazards application?

  • A. Precautions
  • B. Lock Outs
  • C. Material Safety Data Sheets (MSDS)
  • D. Hazardous Materials
  • E. Tag Outs
  • F. Safety Plans

Answer: A,C,D

Explanation:
The Hazards application in IBM Maximo Manage v8.0 allows users to associate Material Safety Data Sheets (MSDS), Hazardous Materials, and Precautions with a particular hazard. These associations help in managing safety information related to hazards and in ensuring compliance with safety regulations.


NEW QUESTION # 46
Which application in the IBM Maximo Application Suite uses both Al and remote human-based interactions to help technicians receive on-demand assistance?

  • A. Maximo Safety
  • B. Maximo Assist
  • C. Maximo Monitor
  • D. Maximo Manage

Answer: B

Explanation:
Maximo Assist uses both Al and remote human-based interactions to help technicians receive on-demand assistance.


NEW QUESTION # 47
When creating a new Inspection form, a client requires a Work Order to be created if certain responses are recorded. Which two actions are required for this to be achieved?

  • A. Choose Work Order on question action.
  • B. Make the question response interactive.
  • C. Create an escalation on the QRESPONSE Object.
  • D. In the Question Options, set the Require action flag.
  • E. In Form Settings add an Action Script.

Answer: A,D

Explanation:
According to the IBM documentation, you can create inspection forms that detail the questions and types of responses that you want to collect. The inspection forms that you create are then available to inspectors in the Conduct an Inspection tool. You can also add conditions to the response fields of existing questions on inspection forms to gather more information. You can determine which additional response fields appear to inspectors, depending on the answers they gave to inspection form questions.
To create a work order based on certain responses, you need to do two things:
Choose Work Order on question action: This option allows you to specify an action that is triggered when a certain response is selected by the inspector. For example, if a question asks "Is there any damage?", and the inspector selects "Yes", you can choose Work Order as the action that is triggered by this response. This will create a work order for repairing the damage.
In the Question Options, set the Require action flag: This option allows you to indicate that an action is required for a question. For example, if a question asks "Is there any damage?", and you set the Require action flag to Yes, then the inspector must select a response that triggers an action, such as Work Order or Notification. If they select a response that does not trigger an action, such as "No" or "N/A", they will see an error message and will not be able to submit the inspection form.


NEW QUESTION # 48
Calendars can be associated with which three record types?

  • A. Items
  • B. Locations
  • C. Job Plan
  • D. Person
  • E. Assets
  • F. Contracts

Answer: B,D,E


NEW QUESTION # 49
Which limit is used to trigger a Condition Monitoring Point with a GAUGE Meter Type?

  • A. Meter Limit
  • B. Action Limit -
  • C. Warning Limit
  • D. Measurement Limit

Answer: B

Explanation:
In IBM Maximo Manage, the Action Limit is used to trigger a Condition Monitoring Point with a GAUGE Meter Type.


NEW QUESTION # 50
What are the three usage types in the Inventory Usage application?

  • A. STAGED
  • B. MOVE
  • C. ISSUE
  • D. TRANSFER
  • E. RECEIV
  • F. MIXED

Answer: A,C,D

Explanation:
In IBM Maximo Manage v8.0 implementation, the usage types in the Inventory Usage application are ISSUE, STAGED, and TRANSFER. ISSUE is used to relieve items from inventory for use in maintenance or other processes. STAGED is used to reserve items for future use. TRANSFER is used to move items from one inventory location to another, typically within the same organization.


NEW QUESTION # 51
When a Service Level Agreement is applied to a WORKORDER object, what Commitment Type will be missing from the lookup?

  • A. DOWNTIME
  • B. CONTACT
  • C. DELIVERY
  • D. AVAILABILITY

Answer: C

Explanation:
When a Service Level Agreement (SLA) is applied to a WORKORDER object in IBM Maximo Manage v8.0 implementation, the Commitment Type that will be missing from the lookup is DELIVERY. The other possible Commitment Types in Maximo Manage are DOWNTIME, AVAILABILITY, and CONTACT.


NEW QUESTION # 52
When users are added to multiple security groups, the authorization privileges of the security groups combine, with the exception of security groups with which setting?

  • A. Separate
  • B. Independent
  • C. Discreet
  • D. Autonomous

Answer: B

Explanation:
When users are added to multiple security groups, the authorization privileges of the security groups combine, with the exception of security groups with the "Independent" setting. When a security group has the "Independent" setting, its authorization privileges are applied separately from any other security group that the user belongs to.


NEW QUESTION # 53
What can be done when decommissioning a location that cannot be done when decommissioning an asset?

  • A. Delete Associated Service Addresses That will be made Redundant?
  • B. Roll New Status down to All Assets in All Changed Locations?
  • C. Remove All Reference to This Location from All Contracts?
  • D. Remove All References to This Location from All Job Plans?

Answer: B

Explanation:
When decommissioning a location in IBM Maximo Manage, you can roll the new status down to all assets in all changed locations. This cannot be done when decommissioning an asset.


NEW QUESTION # 54
The loT Connector provides Maximo Manage, Maximo Health and Maximo Predict the ability to connect to which two data sources?

  • A. Maximo Safety
  • B. Maximo Spatial
  • C. IBM Watson loT Platform
  • D. Maximo Monitor
  • E. Maximo Assist

Answer: C,D

Explanation:
IoT Connector provides Maximo Manage, Maximo Health and Maximo Predict the ability to connect to C. IBM Watson IoT Platform and E. Maximo Monitor data sources. The IoT Connector in the Administration Work Center can be used to configure a connection to an IoT platform such as IBM Watson IoT Platform and IBM Maximo Asset Monitor1.


NEW QUESTION # 55
In which status can a Job Plan be modified to add a new task?

  • A. INACTIVE
  • B. NEW
  • C. REVISED
  • D. PNDREV

Answer: C


NEW QUESTION # 56
......

C1000-132 Cert Guide PDF 100% Cover Real Exam Questions: https://braindumpsschool.vce4plus.com/IBM/C1000-132-valid-vce-dumps.html